Share:

OR 140 (HWY 431) over DEEP CREEK

Map 

Coordinates:
+42.17494, -119.87098
42°10'30" N, 119°52'16" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:OR 140 (HWY 431) over DEEP CREEK
Structure number:08848A431 02965
Location:014 MI E ADEL
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:45.9 ft. [14.0 m]
Total length:161.1 ft. [49.1 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Slab [01]
Deck type:Other [9]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2014 

Status:Open, no restriction [A]
Average daily traffic:180 [as of 2010]
Truck traffic:17% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:27.4 tons [24.9 metric tons]
Sufficiency rating:66.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$908,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201466.0Not deficientSatisfactoryFairSatisfactory180
May 201256.3Structurally deficientSatisfactoryFairPoor180
May 201079.5Not deficientSatisfactoryFairSatisfactory230
May 200890.6Not deficientSatisfactorySatisfactorySatisfactory230
May 200676.8Not deficientSatisfactoryFairSatisfactory300
May 200476.9Not deficientSatisfactoryFairSatisfactory280
May 200288.0Not deficientVery GoodSatisfactoryGood280
May 200087.9Not deficientVery GoodSatisfactoryGood300
April 199888.9Not deficientVery GoodSatisfactoryGood300
April 199693.5Not deficientVery GoodSatisfactoryGood250
April 199493.5Not deficientVery GoodSatisfactoryGood250
April 199293.5Not deficientVery GoodSatisfactoryGood250
April 199085.4Not deficientGoodGoodGood300