HWY 2W WB over HWY 61 NB TO HWY 2W WB

Map 

Coordinates:
+45.53526, -122.69046
45°32'07" N, 122°41'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY 2W WB over HWY 61 NB TO HWY 2W WB
Structure number:09268A02W 00121
Location:WEST FREMONT INTCHGE
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:175.9 ft. [53.6 m]
Total length:2312.1 ft. [704.7 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:43.6 ft. [13.3 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Vertical clearance below bridge:25.3 ft. [7.7 m]
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:8
Main spans material:Steel continuous [4]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,611 [as of 2008]
Truck traffic:18% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:91.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,301 [as of 1998]
Truck traffic:18% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,900 [as of 1990]
Truck traffic:18% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.8