Facts 

Name:NW COUCH BURNSIDE over SB ON RAMP CONN 5
Structure number:09279 061 00233
Location:005 MI W OF PORTLAND CC
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:29.9 ft. [9.1 m]
Total length:454.1 ft. [138.4 m]
Roadway width between curbs:21.7 ft. [6.6 m]
Deck width edge-to-edge:32.5 ft. [9.9 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,000 [as of 2008]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.3
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,326,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,301 [as of 1998]
Truck traffic:10% of total traffic
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$153,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,300 [as of 1990]
Truck traffic:10% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.7