Facts 

Name:COLUMBIA BLVD over B-78A OVER BNRR
Structure number:09685A000000223
Location:IN N PORTLAND
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:78.1 ft. [23.8 m]
Total length:207.0 ft. [63.1 m]
Roadway width between curbs:26.9 ft. [8.2 m]
Deck width edge-to-edge:33.8 ft. [10.3 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:25°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,418 [as of 2007]
Truck traffic:25% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.9 tons [51.7 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$1,061,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,260 [as of 1997]
Truck traffic:25% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$475,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,500 [as of 1989]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.3