COLUMBIA BLVD over B-78A OVER BNRR
Map
Coordinates:
+45.59333, -122.7145645°35'36" N, 122°42'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | COLUMBIA BLVD over B-78A OVER BNRR |
| Structure number: | 09685A000000223 |
| Location: | IN N PORTLAND |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 78.1 ft. [23.8 m] |
| Total length: | 207.0 ft. [63.1 m] |
| Roadway width between curbs: | 26.9 ft. [8.2 m] |
| Deck width edge-to-edge: | 33.8 ft. [10.3 m] |
| Vertical clearance below bridge: | 22.3 ft. [6.8 m] |
| Skew angle: | 25° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1968 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,418 [as of 2007] |
| Truck traffic: | 25% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.9 tons [51.7 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.7 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $1,061,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,260 [as of 1997] |
| Truck traffic: | 25% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 63.4 tons [57.6 metric tons] |
| Inventory rating: | 39.6 tons [36.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.8 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $475,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,500 [as of 1989] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.3 |