Share:

CORNELL ROAD over B-124 (3RD W. OF TUNNEL)

Map 

Coordinates:
+45.53040, -122.71714
45°31'49" N, 122°43'02" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CORNELL ROAD over B-124 (3RD W. OF TUNNEL)
Structure number:11041A140900000
Location:IN NW PORTLAND
Route classification:Collector (Urban) [17]
Length of largest span:89.9 ft. [27.4 m]
Total length:214.9 ft. [65.5 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:35.4 ft. [10.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,331 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:92.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,550 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:92.4

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,900 [as of 1988]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.7