Facts 

Name:GILKEY ROAD over THOMAS CREEK
Structure number:12943 062900107
Location:003 MI N CR 628
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:120.1 ft. [36.6 m]
Total length:201.1 ft. [61.3 m]
Roadway width between curbs:17.4 ft. [5.3 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Vertical clearance above deck:11.8 ft. [3.6 m]
Owner:County Highway Agency [02]
Year built:1939
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:M 13.5 / H 15 [2]
Main span material:Wood or timber [7]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:250 [as of 2005]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:38.0 tons [34.5 metric tons]
Inventory rating:23.0 tons [20.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,133,000

2000 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:225 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:16.8 tons [15.3 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$469,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:225 [as of 1991]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:11.9 tons [10.8 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:36.0