I-205 (HWY 064) over Oxing Hwy 2 & UPRR
Map
Coordinates:
+45.53269, -122.5648345°31'58" N, 122°33'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-205 (HWY 064) over Oxing Hwy 2 & UPRR |
| Structure number: | 13516A064 02159 |
| Location: | 5.1 MI S ORE-WASH LINE |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 160.1 ft. [48.8 m] |
| Total length: | 426.5 ft. [130.0 m] |
| Roadway width between curbs: | 34.1 ft. [10.4 m] |
| Deck width edge-to-edge: | 155.5 ft. [47.4 m] |
| Vertical clearance below bridge: | 18.7 ft. [5.7 m] |
| Skew angle: | 45° |
| Owner: | State Highway Agency [01] |
| Year built: | 1978 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 129,500 [as of 2008] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $11,033,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 134,300 [as of 1998] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $8,479,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 89,200 [as of 1989] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.0 |