I-205 (HWY 064)CON over HWY 2, HWY 64, LT RL
Map
Coordinates:
+45.53185, -122.5656545°31'55" N, 122°33'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-205 (HWY 064)CON over HWY 2, HWY 64, LT RL |
| Structure number: | 13516D064C02159 |
| Location: | 5.1 MI S ORE-WASH LINE |
| Purpose: | Carries highway overpass over highway and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 190.0 ft. [57.9 m] |
| Total length: | 1109.6 ft. [338.2 m] |
| Roadway width between curbs: | 34.1 ft. [10.4 m] |
| Deck width edge-to-edge: | 37.4 ft. [11.4 m] |
| Vertical clearance below bridge: | 17.7 ft. [5.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1985 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 7 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,106 [as of 2008] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 96.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $6,942,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,750 [as of 1998] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 95.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $6,195,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,500 [as of 1989] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 95.0 |