Facts
| Name: | SB CONN TO GLISAN over EB HWY 2 TO SB HWY 64 |
| Structure number: | 13516F064C02138 |
| Location: | 5.2 MI S ORE-WASH LINE |
| Purpose: | Carries highway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 150.9 ft. [46.0 m] |
| Total length: | 150.9 ft. [46.0 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 29.5 ft. [9.0 m] |
| Vertical clearance below bridge: | 23.6 ft. [7.2 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1985 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,344 [as of 2008] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 98.8 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,200 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $594,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,400 [as of 1989] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 94.0 |