Share:

SB CONN TO GLISAN over EB HWY 2 TO SB HWY 64

Map 

Coordinates:
+45.50442, -122.56595
45°30'16" N, 122°33'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SB CONN TO GLISAN over EB HWY 2 TO SB HWY 64
Structure number:13516F064C02138
Location:5.2 MI S ORE-WASH LINE
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:150.9 ft. [46.0 m]
Total length:150.9 ft. [46.0 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:29.5 ft. [9.0 m]
Vertical clearance below bridge:23.6 ft. [7.2 m]
Owner:State Highway Agency [01]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Prestressed concrete [5]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,344 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:98.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,200 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$594,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,400 [as of 1989]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:94.0