DIVISION STREET over Light Rail & CONN SB
Map
Coordinates:
+45.49735, -122.5655745°29'50" N, 122°33'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | DIVISION STREET over Light Rail & CONN SB |
| Structure number: | 13528A064C01963 |
| Location: | 7.0 MI S ORE-WASH LINE |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 115.2 ft. [35.1 m] |
| Total length: | 115.2 ft. [35.1 m] |
| Roadway width between curbs: | 62.0 ft. [18.9 m] |
| Deck width edge-to-edge: | 78.4 ft. [23.9 m] |
| Vertical clearance below bridge: | 17.1 ft. [5.2 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1979 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,269 [as of 2008] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 89.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $589,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,500 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 53.5 tons [48.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 85.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $1,149,000 |
1992 Inspection
| Average daily traffic: | 2,000 |