YEON/FRONT-NW 26TH over B-129 OVER BN/SFRR
Map
Coordinates:
+45.54614, -122.7035645°32'46" N, 122°42'13" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | YEON/FRONT-NW 26TH over B-129 OVER BN/SFRR |
| Structure number: | 16660 000000000 |
| Location: | NW FRONT/NW YEON CONNECT |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 204.1 ft. [62.2 m] |
| Total length: | 1319.9 ft. [402.3 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 48.9 ft. [14.9 m] |
| Vertical clearance below bridge: | 23.6 ft. [7.2 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1987 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,825 [as of 2007] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 60.8 tons [55.3 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 99.6 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,500 [as of 1998] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 99.7 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,650 [as of 1989] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 99.8 |