Share:

SE TACOMA ST over B-39 OVER JOHNSON CREEK

Map 

Coordinates:
+45.46377, -122.63429
45°27'50" N, 122°38'03" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SE TACOMA ST over B-39 OVER JOHNSON CREEK
Structure number:17123 000 B-39
Location:0.1 MI E. OF MCLOUGHLIN
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:124.0 ft. [37.8 m]
Total length:127.0 ft. [38.7 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:52.2 ft. [15.9 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,459 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:57.9 tons [52.6 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Sufficiency rating:95.5

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,740 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:96.1