N BURGARD ST over B-1 OVER UP/SPRR
Map
Coordinates:
+45.60638, -122.7662145°36'23" N, 122°45'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | N BURGARD ST over B-1 OVER UP/SPRR |
| Structure number: | 25B01 000 00136 |
| Location: | AT TERMINAL NO 4 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 21.0 ft. [6.4 m] |
| Total length: | 126.0 ft. [38.4 m] |
| Roadway width between curbs: | 39.7 ft. [12.1 m] |
| Deck width edge-to-edge: | 48.6 ft. [14.8 m] |
| Vertical clearance below bridge: | 24.6 ft. [7.5 m] |
| Skew angle: | 5° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1930 |
| Year reconstructed: | 1988 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,870 [as of 2007] |
| Truck traffic: | 22% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 43.9 tons [39.9 metric tons] |
| Inventory rating: | 27.0 tons [24.5 metric tons] |
| Sufficiency rating: | 77.3 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,550 [as of 1997] |
| Truck traffic: | 22% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 43.6 tons [39.6 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 79.5 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $647,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,000 [as of 1989] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 16.1 tons [14.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.5 |