Share:

NW THURMAN ST over B-15 X MACLEAY PARK

Map 

Coordinates:
+45.53555, -122.71263
45°32'08" N, 122°42'45" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NW THURMAN ST over B-15 X MACLEAY PARK
Structure number:25B15 000 00001
Location:BALCH GULCH AT FOREST PK
Purpose:Carries highway and pedestrian walkway over pedestrian/bicycle trail
Route classification:Collector (Urban) [17]
Length of largest span:160.1 ft. [48.8 m]
Total length:400.0 ft. [121.9 m]
Roadway width between curbs:26.9 ft. [8.2 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1905
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 9 / H 10 [1]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:4,028 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:29.9 tons [27.2 metric tons]
Inventory rating:23.0 tons [20.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:54.3
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$2,049,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:3,650 [as of 1996]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:56.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,125,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,069 [as of 1983]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:17.4 tons [15.8 metric tons]
Inventory rating:12.4 tons [11.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:49.7