NE GLISAN ST over B-33 X SEALED OFF RR ROW
Map
Coordinates:
+45.52636, -122.5711445°31'35" N, 122°34'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NE GLISAN ST over B-33 X SEALED OFF RR ROW |
| Structure number: | 25B33 000 00000 |
| Location: | AT NE 90TH AVE |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 18.0 ft. [5.5 m] |
| Total length: | 109.9 ft. [33.5 m] |
| Roadway width between curbs: | 49.9 ft. [15.2 m] |
| Deck width edge-to-edge: | 65.0 ft. [19.8 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1911 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 24,810 [as of 2007] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 55.9 tons [50.8 metric tons] |
| Inventory rating: | 32.9 tons [29.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.6 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $564,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,700 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 55.4 tons [50.4 metric tons] |
| Inventory rating: | 32.7 tons [29.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.8 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $914,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 23,400 [as of 1989] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Sufficiency rating: | 64.8 |