NE GLISAN ST over B-33 X SEALED OFF RR ROW

Map 

Coordinates:
+45.52636, -122.57114
45°31'35" N, 122°34'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NE GLISAN ST over B-33 X SEALED OFF RR ROW
Structure number:25B33 000 00000
Location:AT NE 90TH AVE
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:18.0 ft. [5.5 m]
Total length:109.9 ft. [33.5 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:65.0 ft. [19.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1911
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:24,810 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.6
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$564,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,700 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.4 tons [50.4 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.8
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$914,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,400 [as of 1989]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Sufficiency rating:64.8