Facts
| Name: | SE 122ND AVE over B-99 OVER JOHNSON CREEK |
| Structure number: | 51C20 000 |
| Location: | 00.4 MI S OF FOSTER ROAD |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 17.1 ft. [5.2 m] |
| Total length: | 118.1 ft. [36.0 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1959 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 7 |
| Main spans material: | Wood or timber [7] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 2,119 [as of 2007] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 37.0 tons [33.6 metric tons] |
| Inventory rating: | 27.9 tons [25.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.3 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $605,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,920 [as of 1996] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 27.7 tons [25.2 metric tons] |
| Sufficiency rating: | 72.1 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,090,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1980] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 25.0 tons [22.7 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 72.2 |