Share:

COLUMBIA BLVD over B-103 X NE 33RD AVE

Map 

Coordinates:
+45.57350, -122.62984
45°34'25" N, 122°37'47" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COLUMBIA BLVD over B-103 X NE 33RD AVE
Structure number:51C33 000 00001
Location:IN NE PORTLAND
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:40.0 ft. [12.2 m]
Total length:101.1 ft. [30.8 m]
Roadway width between curbs:71.9 ft. [21.9 m]
Deck width edge-to-edge:82.0 ft. [25.0 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,802 [as of 2007]
Truck traffic:20% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.0 tons [31.8 metric tons]
Inventory rating:21.0 tons [19.1 metric tons]
Sufficiency rating:74.7

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:25,600 [as of 1997]
Truck traffic:20% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Sufficiency rating:76.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,329,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,800 [as of 1989]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:30.4 tons [27.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0