Share:

SR 51 SAW MILL RUN over SAW MILL RUN

Map 

Coordinates:
+40.40119, -80.00050
40°24'04" N, 80°00'02" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 51 SAW MILL RUN over SAW MILL RUN
Structure number:020051037019070
Location:NEAR EDGEBROOK AVE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:44.9 ft. [13.7 m]
Total length:49.9 ft. [15.2 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1941
Year reconstructed:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,232 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:75.8 tons [68.9 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:70.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30,109 [as of 2000]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:70.6