SR 0065 SB over FONTELLA ST.
Map
Coordinates:
+40.44872, -80.0196440°26'55" N, 80°01'11" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 0065 SB over FONTELLA ST. |
| Structure number: | 020065000503560 |
| Location: | TR 65 SB O/FONTELLA ST. |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 105.0 ft. [32.0 m] |
| Total length: | 626.0 ft. [190.8 m] |
| Roadway width between curbs: | 51.8 ft. [15.8 m] |
| Deck width edge-to-edge: | 64.0 ft. [19.5 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1991 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 6 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,015 [as of 2008] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 21.0 tons [19.1 metric tons] |
| Sufficiency rating: | 74.9 |
| Estimated cost of work: | $1,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,234 [as of 2000] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 20.8 tons [18.9 metric tons] |
| Sufficiency rating: | 75.3 |
| Estimated cost of work: | $741,000 |