1039 NB over SR279 SB RP SR 8041 RP D
Map
Coordinates:
+40.44851, -80.0073940°26'55" N, 80°00'27" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 1039 NB over SR279 SB RP SR 8041 RP D |
| Structure number: | 020279006400000 |
| Location: | APPROACH TO FT DUQUESNE |
| Purpose: | Carries highway over highway and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 113.9 ft. [34.7 m] |
| Total length: | 452.1 ft. [137.8 m] |
| Roadway width between curbs: | 27.6 ft. [8.4 m] |
| Deck width edge-to-edge: | 30.5 ft. [9.3 m] |
| Vertical clearance below bridge: | 29.9 ft. [9.1 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1968 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 42,570 [as of 2010] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 81.8 tons [74.4 metric tons] |
| Inventory rating: | 49.0 tons [44.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 65.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 50,565 [as of 2000] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 61.4 tons [55.8 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 67.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $583,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 26,499 [as of 1992] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 71.3 tons [64.8 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.7 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $683,000 |