Facts 

Name:FORT DUQ BR SB over FT DUQ BRDG NB, ALLEGH R
Structure number:020279006504520
Location:I-279 SB FT DUQ. BR
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:422.9 ft. [128.9 m]
Total length:921.0 ft. [280.7 m]
Roadway width between curbs:53.5 ft. [16.3 m]
Deck width edge-to-edge:61.4 ft. [18.7 m]
Vertical clearance below bridge:1624.1 ft. [495.0 m]
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Arch - Thru [12]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,573 [as of 2010]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:86.8 tons [78.9 metric tons]
Inventory rating:51.9 tons [47.2 metric tons]
Sufficiency rating:60.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,000