PENN LINCOLN PY over BATES ST

Map 

Coordinates:
+40.43150, -79.95888
40°25'53" N, 79°57'32" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:PENN LINCOLN PY over BATES ST
Structure number:020376002417350
Location:PARKWAY EAST O/BATES ST
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:76.1 ft. [23.2 m]
Total length:195.9 ft. [59.7 m]
Roadway width between curbs:88.9 ft. [27.1 m]
Deck width edge-to-edge:95.5 ft. [29.1 m]
Vertical clearance below bridge:17.7 ft. [5.4 m]
Skew angle:10°
Owner:State Highway Agency [01]
Year built:1952
Year reconstructed:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,061 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.9 tons [58.1 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:81.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:106,433 [as of 2000]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:78.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$738,000