PENN LINCOLN PY over SALINE STREET
Map
Coordinates:
+40.42938, -79.9424340°25'46" N, 79°56'33" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PENN LINCOLN PY over SALINE STREET |
| Structure number: | 020376003421860 |
| Location: | SALINE ST BRIDGE |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 67.9 ft. [20.7 m] |
| Total length: | 472.1 ft. [143.9 m] |
| Roadway width between curbs: | 91.9 ft. [28.0 m] |
| Deck width edge-to-edge: | 95.5 ft. [29.1 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1951 |
| Year reconstructed: | 2007 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 7 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 45,808 [as of 2009] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 66.9 tons [60.8 metric tons] |
| Inventory rating: | 39.9 tons [36.3 metric tons] |
| Sufficiency rating: | 81.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 117,352 [as of 2000] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 65.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,254,000 |