HULTON BR over N & S RR ALLEGHENY RIVER
Map
Coordinates:
+40.52829, -79.8496440°31'42" N, 79°50'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HULTON BR over N & S RR ALLEGHENY RIVER |
| Structure number: | 022082001001480 |
| Location: | OAKMONT BORO HULTON BRIDG |
| Purpose: | Carries highway and pedestrian walkway over railroad and waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 504.9 ft. [153.9 m] |
| Total length: | 1544.0 ft. [470.6 m] |
| Roadway width between curbs: | 21.0 ft. [6.4 m] |
| Deck width edge-to-edge: | 22.3 ft. [6.8 m] |
| Vertical clearance above deck: | 14.1 ft. [4.3 m] |
| Vertical clearance below bridge: | 164.1 ft. [50.0 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1909 |
| Year reconstructed: | 2000 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 5 |
| Main spans material: | Steel [3] |
| Main spans design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,046 [as of 2008] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 38.9 tons [35.4 metric tons] |
| Inventory rating: | 5.0 tons [4.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 2.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $9,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 23,248 [as of 2000] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 5.9 tons [5.4 metric tons] |
| Sufficiency rating: | 5.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $2,816,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,710 [as of 1992] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 61.4 tons [55.8 metric tons] |
| Inventory rating: | 40.6 tons [36.9 metric tons] |
| Sufficiency rating: | 19.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,729,000 |