MILLTOWN RD over PLUM CREEK

Map 

Coordinates:
+40.51091, -79.79301
40°30'39" N, 79°47'35" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MILLTOWN RD over PLUM CREEK
Structure number:022084001403560
Location:1/4 MI. EAST OF SR 2058
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:50.9 ft. [15.5 m]
Total length:56.1 ft. [17.1 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:23.0 ft. [7.0 m]
Owner:State Highway Agency [01]
Year built:1979
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Closed Grating [4]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, would be posted or closed except for temporary shoring [D]
Average daily traffic:2,295 [as of 2009]
Truck traffic:13% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:88.8 tons [80.7 metric tons]
Inventory rating:52.9 tons [48.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,088 [as of 2000]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:51.5 tons [46.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:50.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$417,000