SHALER ST over TR 19 & 51
Map
Coordinates:
+40.43339, -80.0286240°26'00" N, 80°01'43" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SHALER ST over TR 19 & 51 |
| Structure number: | 023110001000000 |
| Location: | 1/4 MI. N.W. OF SR 0279 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 60.0 ft. [18.3 m] |
| Total length: | 164.1 ft. [50.0 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 39.0 ft. [11.9 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 7° |
| Owner: | State Highway Agency [01] |
| Year built: | 1949 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,289 [as of 2010] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 18.9 tons [17.2 metric tons] |
| Inventory rating: | 11.0 tons [10.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 17.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 119 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 28.7 tons [26.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 47.4 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,011,000 |