Share:

T-725THORN HILL RD over PA TURNPIKE(I-76)WB-400

Map 

Coordinates:
+40.66727, -80.09797
40°40'02" N, 80°05'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:T-725THORN HILL RD over PA TURNPIKE(I-76)WB-400
Structure number:027076990029330
Location:WEST OF WARRENDALE
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:86.9 ft. [26.5 m]
Total length:139.1 ft. [42.4 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:48.2 ft. [14.7 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:20°
Owner:State Toll Authority [31]
Year built:1952
Year reconstructed:1983
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,384 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.9 tons [59.0 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:40.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,384 [as of 1990]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$569,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$612,000