TRIPHAMMER RD over PINEY FORK CREEK

Map 

Coordinates:
+40.39378, -80.08733
40°23'38" N, 80°05'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TRIPHAMMER RD over PINEY FORK CREEK
Structure number:027219031525710
Location:PF01 PINEY FORK CRK # 1
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:29.9 ft. [9.1 m]
Total length:29.9 ft. [9.1 m]
Roadway width between curbs:16.4 ft. [5.0 m]
Deck width edge-to-edge:20.0 ft. [6.1 m]
Owner:County Highway Agency [02]
Year built:1902
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:803 [as of 2005]
Truck traffic:1% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:24.0 tons [21.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:55.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:803 [as of 1999]
Truck traffic:1% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$52,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:803 [as of 1991]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$71,000