Share:

ELIZABETH ST over CSX RR,GLOSTER ST

Map 

Coordinates:
+40.40696, -79.94407
40°24'25" N, 79°56'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ELIZABETH ST over CSX RR,GLOSTER ST
Structure number:027301000030290
Location:301029 OFF 2ND AVE
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Local (Urban) [19]
Length of largest span:82.0 ft. [25.0 m]
Total length:115.2 ft. [35.1 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:City or Municipal Highway Agency [04]
Year reconstructed:1979
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,000 [as of 2004]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.9 tons [58.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,000 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.4 tons [57.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$312,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,598 [as of 1982]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:62.4 tons [56.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$327,000