ELIZABETH ST over CSX RR,GLOSTER ST
Map
Coordinates:
+40.40696, -79.9440740°24'25" N, 79°56'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ELIZABETH ST over CSX RR,GLOSTER ST |
| Structure number: | 027301000030290 |
| Location: | 301029 OFF 2ND AVE |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 82.0 ft. [25.0 m] |
| Total length: | 115.2 ft. [35.1 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 38.1 ft. [11.6 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year reconstructed: | 1979 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,000 [as of 2004] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 63.9 tons [58.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.3 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,000 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 63.4 tons [57.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 60.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $312,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,598 [as of 1982] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 62.4 tons [56.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.4 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $327,000 |