Share:

HILL RD over ZOO WALKWAY

Map 

Coordinates:
+40.48333, -79.92167
40°28'60" N, 79°55'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HILL RD over ZOO WALKWAY
Structure number:027301000030430
Location:301043 IN HIGHLAND PARK
Purpose:Carries highway and pedestrian walkway over pedestrian/bicycle trail
Route classification:Local (Urban) [19]
Length of largest span:48.9 ft. [14.9 m]
Total length:48.9 ft. [14.9 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:53.2 ft. [16.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1940
Year reconstructed:1980
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 13.5 / H 15 [2]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 2007]
Truck traffic:5% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1999]
Truck traffic:5% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,000 [as of 1991]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$157,000