Share:

N AVE&BRIGHTON RD over N-S RR-ALLEGHENY PARK

Map 

Coordinates:
+40.45398, -80.01458
40°27'14" N, 80°00'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:N AVE&BRIGHTON RD over N-S RR-ALLEGHENY PARK
Structure number:027301000030670
Location:301067 N AVE-BRIGHTON RD
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Local (Urban) [19]
Length of largest span:84.0 ft. [25.6 m]
Total length:87.9 ft. [26.8 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:46.9 ft. [14.3 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:45°
Owner:Railroad [27]
Year built:1905
Year reconstructed:1929
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:21,000 [as of 2005]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:18.9 tons [17.2 metric tons]
Inventory rating:11.0 tons [10.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:2.0
Recommended work:Other structural work, including hydraulic replacements. [38]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,000 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:56.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$389,000

1992 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:21,000 [as of 1991]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:46.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$389,000