Share:

WOOD ST over I-376 WB (PARKWAY EAST)

Map 

Coordinates:
+40.43730, -80.00269
40°26'14" N, 80°00'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WOOD ST over I-376 WB (PARKWAY EAST)
Structure number:027301000031200
Location:301120 WOOD STREET BRIDGE
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:66.9 ft. [20.4 m]
Total length:69.9 ft. [21.3 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:95.1 ft. [29.0 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1939
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 2004]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Sufficiency rating:94.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:84.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$588,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$332,000