CENTRE AV over EAST BUSWAY & N-S RR
Map
Coordinates:
+40.45500, -79.9433340°27'18" N, 79°56'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CENTRE AV over EAST BUSWAY & N-S RR |
| Structure number: | 027301000090010 |
| Location: | P50001 CENTRE AVE-EB0203 |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 112.9 ft. [34.4 m] |
| Total length: | 223.1 ft. [68.0 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 60.0 ft. [18.3 m] |
| Vertical clearance below bridge: | 29.5 ft. [9.0 m] |
| Skew angle: | 35° |
| Owner: | Private (other than railroad) [26] |
| Year built: | 1979 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,500 [as of 2006] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 59.8 tons [54.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 62.5 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,500 [as of 1995] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 93.1 tons [84.6 metric tons] |
| Inventory rating: | 55.4 tons [50.4 metric tons] |
| Sufficiency rating: | 83.2 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $252,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,500 [as of 1991] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 93.1 tons [84.6 metric tons] |
| Inventory rating: | 55.4 tons [50.4 metric tons] |
| Sufficiency rating: | 95.3 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $252,000 |