MONROEVILLE BLVD over TURTLE CREEK BRANCH
Map
Coordinates:
+40.41333, -79.8100040°24'48" N, 79°48'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MONROEVILLE BLVD over TURTLE CREEK BRANCH |
| Structure number: | 027446331329200 |
| Location: | TL10 TURTLE CREEK NO 10 |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 24.9 ft. [7.6 m] |
| Total length: | 27.9 ft. [8.5 m] |
| Roadway width between curbs: | 37.1 ft. [11.3 m] |
| Deck width edge-to-edge: | 40.4 ft. [12.3 m] |
| Skew angle: | 43° |
| Owner: | County Highway Agency [02] |
| Year built: | 1988 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Concrete [1] |
| Main span design: | Slab [01] |
| Deck type: | Not applicable [N] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,122 [as of 2005] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 69.9 tons [63.5 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Sufficiency rating: | 91.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,122 [as of 1999] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 63.4 tons [57.6 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Sufficiency rating: | 91.4 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,559 [as of 1991] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 94.4 |