Share:

MAPLE AV over MONROEVILLE AVENUE

Map 

Coordinates:
+40.40754, -79.82251
40°24'27" N, 79°49'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MAPLE AV over MONROEVILLE AVENUE
Structure number:027467000010010
Location:467001 OVER MONROE AVE
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:35.1 ft. [10.7 m]
Total length:37.1 ft. [11.3 m]
Roadway width between curbs:25.3 ft. [7.7 m]
Deck width edge-to-edge:38.4 ft. [11.7 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Prestressed concrete [5]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,600 [as of 2006]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.9 tons [71.7 metric tons]
Inventory rating:46.9 tons [42.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,600 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$102,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,600 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$119,000