Share:

CROSSTOWN BL over FORBES,DIAMOND,RPS.J&G

Map 

Coordinates:
+40.43806, -79.99403
40°26'17" N, 79°59'39" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CROSSTOWN BL over FORBES,DIAMOND,RPS.J&G
Structure number:028002028000000
Location:RP.FROM BLVD.TO 1026 NB.
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:125.0 ft. [38.1 m]
Total length:976.1 ft. [297.5 m]
Roadway width between curbs:20.7 ft. [6.3 m]
Deck width edge-to-edge:24.6 ft. [7.5 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:6
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:153 [as of 2010]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:28.9 tons [26.3 metric tons]
Sufficiency rating:92.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,000

2000 Inspection 

Average daily traffic:14,205 [as of 2000]
Evaluation:Not applicable [N]