CROSSTOWN BL over FORBES,DIAMOND,RPS.J&G
Map
Coordinates:
+40.43806, -79.9940340°26'17" N, 79°59'39" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CROSSTOWN BL over FORBES,DIAMOND,RPS.J&G |
| Structure number: | 028002028000000 |
| Location: | RP.FROM BLVD.TO 1026 NB. |
| Purpose: | Carries highway over highway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 125.0 ft. [38.1 m] |
| Total length: | 976.1 ft. [297.5 m] |
| Roadway width between curbs: | 20.7 ft. [6.3 m] |
| Deck width edge-to-edge: | 24.6 ft. [7.5 m] |
| Vertical clearance above deck: | 16.4 ft. [5.0 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Year reconstructed: | 1984 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 6 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 153 [as of 2010] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 28.9 tons [26.3 metric tons] |
| Sufficiency rating: | 92.1 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,000 |
2000 Inspection
| Average daily traffic: | 14,205 [as of 2000] |
| Evaluation: | Not applicable [N] |