Share:

T-751 (CO.BR.#37) over BECKWITH CREEK

Map 

Coordinates:
+41.95121, -76.88743
41°57'04" N, 76°53'15" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:T-751 (CO.BR.#37) over BECKWITH CREEK
Structure number:087233075100370
Location:0.15 MI. S. OF SR 4031
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:83.0 ft. [25.3 m]
Total length:86.0 ft. [26.2 m]
Roadway width between curbs:12.5 ft. [3.8 m]
Deck width edge-to-edge:13.8 ft. [4.2 m]
Skew angle:16°
Owner:County Highway Agency [02]
Year built:1908
Year reconstructed:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Open Grating [3]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:23.0 tons [20.9 metric tons]
Inventory rating:12.0 tons [10.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:25.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:22.8 tons [20.7 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:25.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$620,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Sufficiency rating:38.1