Share:

SR 2055(LR158SP A) over LEHIGH CK.CITY ST.NSRR

Map 

Coordinates:
+40.59381, -75.47003
40°35'38" N, 75°28'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 2055(LR158SP A) over LEHIGH CK.CITY ST.NSRR
Structure number:392055002000000
Location:ALBERTUS MEYERS BRIDGE
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Collector (Urban) [17]
Length of largest span:134.8 ft. [41.1 m]
Total length:1959.1 ft. [597.1 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1913
Year reconstructed:1973
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 13.5 / H 15 [2]
Number of main spans:9
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,858 [as of 2010]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000

2000 Inspection 

Average daily traffic:860 [as of 1996]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,650 [as of 1992]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$10,923,000