SR 1011 over GENESEE RIVER

Map 

Coordinates:
+41.92136, -77.77938
41°55'17" N, 77°46'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 1011 over GENESEE RIVER
Structure number:521011004000000
Location:ULYSSES
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:43.0 ft. [13.1 m]
Total length:44.9 ft. [13.7 m]
Roadway width between curbs:24.3 ft. [7.4 m]
Deck width edge-to-edge:27.6 ft. [8.4 m]
Owner:State Highway Agency [01]
Year built:1941
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:477 [as of 2009]
Truck traffic:2% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:37.0 tons [33.6 metric tons]
Inventory rating:28.9 tons [26.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:36.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,240 [as of 2000]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:96.0 tons [87.3 metric tons]
Inventory rating:57.4 tons [52.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:52.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$633,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,083 [as of 1992]
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:96.0 tons [87.3 metric tons]
Inventory rating:57.4 tons [52.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$568,000