Share:

SR 0819 over SR 0119

Map 

Coordinates:
+40.12367, -79.55610
40°07'25" N, 79°33'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 0819 over SR 0119
Structure number:640819009000000
Location:EAST HUNTINGDON TOWNSHIP
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:83.0 ft. [25.3 m]
Total length:145.0 ft. [44.2 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:45.6 ft. [13.9 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:10°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,469 [as of 2010]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:105.8 tons [96.2 metric tons]
Inventory rating:62.9 tons [57.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,160 [as of 2000]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$516,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,707 [as of 1992]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:50.5 tons [45.9 metric tons]
Sufficiency rating:79.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$516,000