ROOSEVELT BLVD EXT over ROBERTS AVENUE;SEPTA
Map
Coordinates:
+40.01923, -75.1636740°01'09" N, 75°09'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ROOSEVELT BLVD EXT over ROBERTS AVENUE;SEPTA |
| Structure number: | 670001013000000 |
| Location: | WAYNE JUNCTION VIA.17F13 |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 210.0 ft. [64.0 m] |
| Total length: | 2589.0 ft. [789.1 m] |
| Roadway width between curbs: | 65.9 ft. [20.1 m] |
| Deck width edge-to-edge: | 72.5 ft. [22.1 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1960 |
| Year reconstructed: | 1983 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 13 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 60,438 [as of 2010] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.8 tons [75.3 metric tons] |
| Inventory rating: | 49.9 tons [45.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 54.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $22,000 |
2000 Inspection
| Average daily traffic: | 18,077 [as of 2000] |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 86,950 [as of 1992] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.2 tons [74.7 metric tons] |
| Inventory rating: | 46.5 tons [42.3 metric tons] |
| Sufficiency rating: | 79.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,396,000 |