SCHUYLKILL EXPWAY. over SWEETBRIAR ROAD
Map
Coordinates:
+39.97689, -75.1982939°58'37" N, 75°11'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SCHUYLKILL EXPWAY. over SWEETBRIAR ROAD |
| Structure number: | 670076342414550 |
| Location: | NR.GIRARD AVE.INCH.28A08 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 49.9 ft. [15.2 m] |
| Total length: | 54.1 ft. [16.5 m] |
| Roadway width between curbs: | 99.7 ft. [30.4 m] |
| Deck width edge-to-edge: | 103.4 ft. [31.5 m] |
| Vertical clearance below bridge: | 13.1 ft. [4.0 m] |
| Skew angle: | 7° |
| Owner: | State Highway Agency [01] |
| Year built: | 1956 |
| Year reconstructed: | 1987 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Concrete [1] |
| Main span design: | Frame [07] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 68,892 [as of 2010] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 63.9 tons [58.1 metric tons] |
| Inventory rating: | 38.0 tons [34.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 170,601 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 83.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 170,224 [as of 1992] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 53.5 tons [48.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 81.0 |