INTERSTATE 95 S.B. over SWAMP LAND (SLUDGE)

Map 

Coordinates:
+39.89144, -75.19923
39°53'29" N, 75°11'57" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:INTERSTATE 95 S.B. over SWAMP LAND (SLUDGE)
Structure number:670095014509030
Location:S.APPR.GIRARD PT. 36K11
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:92.9 ft. [28.3 m]
Total length:2211.1 ft. [673.9 m]
Roadway width between curbs:55.4 ft. [16.9 m]
Deck width edge-to-edge:59.4 ft. [18.1 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1973
Year reconstructed:1979
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:24
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:43,025 [as of 2008]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.9 tons [59.9 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:58.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$24,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:49,577 [as of 2000]
Truck traffic:17% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:68.3 tons [62.1 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$7,899,000