Share:

DELAWARE EXPWAY. over VENANGO STREET

Map 

Coordinates:
+39.98686, -75.09126
39°59'13" N, 75°05'29" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:DELAWARE EXPWAY. over VENANGO STREET
Structure number:670095025024220
Location:NEAR TIOGA STREET 29G06
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:62.0 ft. [18.9 m]
Total length:63.0 ft. [19.2 m]
Roadway width between curbs:116.1 ft. [35.4 m]
Deck width edge-to-edge:126.3 ft. [38.5 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,717 [as of 2009]
Truck traffic:17% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.9 tons [49.9 metric tons]
Inventory rating:30.9 tons [28.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:77.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:136,288 [as of 2000]
Truck traffic:17% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:70.3 tons [63.9 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:79.7
Recommended work:Other structural work, including hydraulic replacements. [38]