Share:

GRANT AVENUE over BYBERRY CREEK

Map 

Coordinates:
+40.06240, -74.99505
40°03'45" N, 74°59'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GRANT AVENUE over BYBERRY CREEK
Structure number:671018007000000
Location:.5MI.N.FRANKFORD 20A05
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:29.9 ft. [9.1 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:66.6 ft. [20.3 m]
Deck width edge-to-edge:99.1 ft. [30.2 m]
Skew angle:28°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,113 [as of 2009]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:50.9 tons [46.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:80.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,121 [as of 2000]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:78.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$741,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,818 [as of 1992]
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:79.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$366,000