Share:

CECIL B.MOORE AVE. over AMTRAK

Map 

Coordinates:
+39.98222, -75.18502
39°58'56" N, 75°11'06" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CECIL B.MOORE AVE. over AMTRAK
Structure number:672010001200000
Location:NEAR 31ST ST. 28C07
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Collector (Urban) [17]
Length of largest span:73.2 ft. [22.3 m]
Total length:137.1 ft. [41.8 m]
Roadway width between curbs:36.4 ft. [11.1 m]
Deck width edge-to-edge:55.1 ft. [16.8 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1909
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Girder and floorbeam system [03]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:3,099 [as of 2010]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:29.9 tons [27.2 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:4,881 [as of 2000]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:22.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,429,000