UNIVERSITY AVENUE over SCHUYLKILL RIVER
Map
Coordinates:
+39.94200, -75.1972739°56'31" N, 75°11'50" W
Source: National Bridge Inventory (1992, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | UNIVERSITY AVENUE over SCHUYLKILL RIVER |
| Structure number: | 673003005000000 |
| Location: | UNIVERSITY AVE. 37A01 |
| Purpose: | Carries highway and pedestrian walkway over highway and waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 120.1 ft. [36.6 m] |
| Total length: | 540.1 ft. [164.6 m] |
| Roadway width between curbs: | 54.5 ft. [16.6 m] |
| Deck width edge-to-edge: | 73.2 ft. [22.3 m] |
| Vertical clearance below bridge: | 32.2 ft. [9.8 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1929 |
| Year reconstructed: | 1985 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Steel [3] |
| Main span design: | Movable - Bascule [16] |
| Deck type: | Open Grating [3] |
| Wearing surface: | Other [9] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,088 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 71.8 tons [65.3 metric tons] |
| Inventory rating: | 42.9 tons [39.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 55.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 34,786 [as of 1992] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 46.5 tons [42.3 metric tons] |
| Sufficiency rating: | 52.3 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,565,000 |