WAYNE AVENUE over CSX (LOW FREIGHT LINE)
Map
Coordinates:
+40.02140, -75.1604440°01'17" N, 75°09'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | WAYNE AVENUE over CSX (LOW FREIGHT LINE) |
| Structure number: | 674007002000550 |
| Location: | NEAR ROBERTS AVE. 17G12 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 32.2 ft. [9.8 m] |
| Total length: | 34.1 ft. [10.4 m] |
| Roadway width between curbs: | 51.8 ft. [15.8 m] |
| Deck width edge-to-edge: | 81.0 ft. [24.7 m] |
| Vertical clearance below bridge: | 17.7 ft. [5.4 m] |
| Skew angle: | 10° |
| Owner: | Railroad [27] |
| Year built: | 1914 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Concrete continuous [2] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,689 [as of 2010] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 84.8 tons [77.1 metric tons] |
| Inventory rating: | 50.9 tons [46.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 61.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,616 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 39.6 tons [36.0 metric tons] |
| Inventory rating: | 23.8 tons [21.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 47.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $363,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,965 [as of 1992] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 39.6 tons [36.0 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 38.5 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $400,000 |