Share:

GERMANTOWN AVENUE over CRESHEIM CREEK

Map 

Coordinates:
+40.06622, -75.19670
40°03'58" N, 75°11'48" W
Source: National Bridge Inventory (1992, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GERMANTOWN AVENUE over CRESHEIM CREEK
Structure number:674007010001360
Location:CHESTNUT HILL 17A04
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:24.9 ft. [7.6 m]
Total length:24.9 ft. [7.6 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:59.7 ft. [18.2 m]
Skew angle:27°
Owner:State Highway Agency [01]
Year built:1885
Year reconstructed:2008
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,418 [as of 2010]
Truck traffic:3% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:75.8 tons [68.9 metric tons]
Inventory rating:55.9 tons [50.8 metric tons]
Sufficiency rating:92.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:11,727 [as of 1992]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:40.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$119,000