CAMBRIA & "A" STS. over CONRAIL

Map 

Coordinates:
+39.99351, -75.12865
39°59'37" N, 75°07'43" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CAMBRIA & "A" STS. over CONRAIL
Structure number:677301001000780
Location:CAMBRIA & A STRS. 29A05
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Local (Urban) [19]
Length of largest span:81.0 ft. [24.7 m]
Total length:184.1 ft. [56.1 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:50.2 ft. [15.3 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1916
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete continuous [2]
Main span design:Girder and floorbeam system [03]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:3,200 [as of 1980]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.9 tons [51.7 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:67.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:3,200 [as of 1980]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.4 tons [51.3 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:71.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$284,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:3,200 [as of 1980]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$481,000